MEP SYSTEM KEY POINTERS FOR SCHOOL, EDUCATIONAL, I...

MEP SYSTEM KEY POINTERS FOR SCHOOL, EDUCATIONAL, INSTITUTION, COLLEGE, UNIVERSITY BUILDING HVAC SYSTEM:- 1. ASHRAE Standard 62.1-2016 recommends that relative humidity in occupied spaces be controlled to less than 65% to reduce the likelihood of conditions that can lead to microbial growth. 2. Temperature of the classroom to be maintained in the range of 24degC to 25deg C. 3. CO2 sensor with control panel to be installed for fresh air intake and energy saving. 4. Keeping low immunity of students into mind enough amount fresh air (ie. 15 cfm per person post Covid-19 norms) along with HEPA filter with plasma ion technology to be installed for removal of Pathogens, airborne, bacteria, fungi and viruses. 5. Sound level of Class room to be control within 35 - 40db range. 6. Proper ventilation to be done chemistry lab to exhaust the hazardous gases while chemical experiments. Air filter with plasma ion technology to be installed in Physic, Chemistry and Biology practical labs. 7. We have selected VRF air conditioning system which is centralise controlled, energy efficient and have safest Refrigerant in terms of environmental conditions. PLUMBING SYSTEM:- 1. State of art hydro-pneumatic booster system for providing equal & required pressure in all the toilet fixtures & fittings. 2. Provision of R.O.Water for drinking purpose. 3. 2 pipe water supply system i.e. separate systems for Domestic & Flushing water supply. 4. 2 day water storage facility, which can act as buffer if any break down takes place in the Municipal supply. 5. PVC & PEX piping shall be used for carrying water supply in the building, thus increasing the flow of water& also it will cause 0 contamination as compared to metal pipes. 6. Water saving fixtures & fitting shall be used which can reduce minimum of 10-20% water requirement. 7. Rain water Harvesting System shall be proposed as a water conservation feature in the project. 8. Sewerage piping system shall be of sound proof PE material, so that the noise of flowing sewage through pipes shall not disturb any of the class rooms. 9. Swimming pool shall have the Ozonator filtration system which kills bacteria, virus & will give sparkling clean water, further tanning will not take place as compared to chlorine dosing system which leaves residue behind. FIRE FIGHTING SYSTEM:- 1. Fully addressable fire alarm system shall be provided. 2. Smoke detectors, heat detectors & flame detectors shall be provided wherever necessary. 3. Aerosol system shall be provided to protect all the Electrical systems. 4. Automatic Sprinkler system shall be provided for the entire building. 5. Fire Hydrant system shall be provided to fight the fire in case of emergency. 6. Fire signages shall be installed all over the building so as to guide the occupants during emergency. 7. Proper assembly points need to be demarcated in the building so that evacuation becomes faster. ELECTRICAL SYSTEM:- 1 Clock system 2 Access control 3 Multimedia smart projector system 4 Public address 5 CCTV 6 Intercom 7 Telecom and data 8 Voice evacuation connected with pa
 2020-08-07T07:13:15

Related Posts

update image

MEP Design and Engineering Description for Pumping Station

2025-11-19T07:41:47 , update date

 2025-11-19T07:41:47
update image

Making Buildings Work

2025-10-31T07:33:22 , update date

 2025-10-31T07:33:22
update image

MEP System Design for Independent Villa Projects

2025-10-23T09:20:13 , update date

 2025-10-23T09:20:13
update image

MEP System Design for Residential Project

2025-10-23T09:01:44 , update date

 2025-10-23T09:01:44